In June 2006, we were assigned by Shanghai Airport Authority to verify and appraise the demolition and relocation cost for Hongqiao Transportation Hub. The work duration of the assignment was short while the items to be verified were numerous and complicated.
The assignment involved a lot of work of collecting and collating data and required accurate analysis and estimation.